r/highspeedrail • u/Anxious-Flower-4317 • 10h ago
Other Paraguayan HrSR idea polished.
In my first post, I was a bit unclear about a lot of stuff. So, I'm here to clean things up.
My revised idea:
I would save over 20 years while working my ass off.
Get around $250M. Loan some money,
Make the train and get donations to pay the loans back,
Show government officials to make them make a HrSR-compatible line with reinforced gravel.
Put the trains on the tracks.
Here's more detail on the train itself.
>It would use a lot of already available parts (e.g., bogies)
>Its max operating speed would be 240 km/h (fast but not true HSR, so way cheaper) and 225 km/h expected cruising
>The line would be Villeta-San Ignacio Guazú-Encarnación (instead of the original San Lorenzo-Caaguazú-CDE line, which could save 2 billion USD).
I'm 13 and saving up for this. In the USA, I dedicate my life to this project and hopefully it can be completed in my lifetime.


