r/Hydrogen2030 • • Aug 14 '26

Those who can participate don’t miss it

Thumbnail
linkedin.com
6 Upvotes

r/Hydrogen2030 • • Aug 07 '26

Blackrock Baby Blackrock

7 Upvotes

Hello Blackrock……..the story BREAKING……..please don’t tell 330 million $2.22 Code Fucked Shorts


r/Hydrogen2030 • • 2h ago

Arcadia Hydrogen Plans

2 Upvotes

What’s a 1000 mw win do for Plug share price ??


r/Hydrogen2030 • • 7h ago

Arcadia eSAF Video 1000 mW

2 Upvotes

Seems Jose Crespo drawing it up clearly and LOUD on Arcadia 1000 mW https://youtu.be/pt3lkfJV1MM?si=dOAxsW9ho6qoMZqI


r/Hydrogen2030 • • 1d ago

Arcadia 1000 megawatts

9 Upvotes

Imagine 6400 Backlog End of 2027 Plug and Arcadia eFuels enter a strategic cooperation agreement positioning Plug as the preferred electrolyzer supplier for more than 1 GW of Arcadia eFuels’ e-SAF projects in Europe and the Americas
280 MW of Plug's GenEco electrolyzers will produce the hydrogen behind Project ENDOR at the Port of Vordingborg, Denmark
Project ENDOR advances toward final investment decision

SLINGERLANDS, N.Y., Sept. 29, 2026 (GLOBE NEWSWIRE) -- Plug Power Inc. (NASDAQ: PLUG), a global leader in comprehensive hydrogen solutions for the hydrogen economy, today announced it has signed a 280-megawatt (MW) GenEco electrolyzer supply agreement with Arcadia eFuels for Project ENDOR in Denmark, together with a strategic cooperation agreement covering Arcadia's future projects. The agreement follows three years of joint engineering work, and deliveries will begin after the project issues notice to proceed.
ENDOR is Arcadia eFuels' flagship facility, located at the Port of Vordingborg on Denmark's south coast. Once built, it will use renewable grid power to run 280 MW of Plug electrolyzers, producing roughly 110 tons of renewable hydrogen a day. Arcadia eFuels will combine that hydrogen with captured carbon dioxide to make jet fuel that works in standard aircraft.


r/Hydrogen2030 • • 22h ago

Billions in Backlog End of 2027

Post image
4 Upvotes

You can doubt……

you can deny……

you can BET end of 2027 MORE than Today $1.38

billion already BOOKED with Amazon ………

then Probability Arcadia 1000 megawatt……..another 1.2 Billion

then 5400 Booked Allied Green Ammonia electrolyzers ……..that’s 5.8 billion

add them up and that’s a 8 Billion backlog the Next Bloom

ive signed with Citadel $7.75 Warrants


r/Hydrogen2030 • • 1d ago

I’m Predicting 6400 megawatts end of 2027 Backlog

4 Upvotes

With Allied Green Ammonia 5400 and Arcadia 1000 megawatts , $Plug will End 2027 at $9 and 6400 megawatts Backlog


r/Hydrogen2030 • • 1d ago

Bloom pulverized red -7%

0 Upvotes

Why?


r/Hydrogen2030 • • 1d ago

230 Gigawatts Electrolyzers 2030

9 Upvotes

How big is the Electrolyzer Market 2030 ?? Imagine In the last couple of years, the production and utilization of electrolyzers have seen an uptrend. According to Blackridge’s Global electrolyzer market report the global electrolysis capacity could reach 230 GW by 2030 if all announced projects are realized and 520 GW if early-stage projects are also included. Europe, Latin America, Africa, and Australia announced huge electrolysis capacity targets for 2030.  The top 5 Hydrogen Electrolyzer manufacturers in the world are LONGi HydrogenTechnology Co., Ltd., Plug Power, Inc., Hygreen Energy, Bloom Energy ,Corporation and ITM Power Plc according to each company's production capacity.


r/Hydrogen2030 • • 2d ago

Such an angry POS

Post image
5 Upvotes

Must be hard to have everything you tout turn to shit


r/Hydrogen2030 • • 1d ago

Nov 9th Earnings Guess Your Best

1 Upvotes

What ya got for revenues and Earnings and HOW many Forklift Engines given they did 1600 last quarter and 680 Q1 ?? Can they keep Momentum ?? 40 engines a dAy capacity production one shift 2880 the Max output one shift 6 days a week

im gonna go 1800 engines and 196 million revenues and seriously close break even and hardly a smidgey of cash used


r/Hydrogen2030 • • 2d ago

Where’s all the $FCEL $BE cheerleaders today ??

1 Upvotes

$FCEL Red -12%
$BE Red -11%

Plug and Ballard red -2%

Fuel Cell remains a crapola of shit


r/Hydrogen2030 • • 3d ago

5400 Megawatts PEM Cost How Much ?

6 Upvotes

The 3000 megawatt plus 2400 megawatts equals A 5,400-megawatt (5,400 MW) Plug Power PEM electrolyzer system costs approximately $5.78 billion to $8.10 billion. [1, 2]

This estimate uses industry capital cost benchmarks of roughly $1,070 to $1,500 per kW for proton exchange membrane (PEM) electrolyzer technology. [1, 2]

Cost Breakdown

  • Capacity: 5,400 MW (5,400,000 kW)
  • Estimated Unit Cost: $1,070 – $1,500 / kW
  • Total Estimated Capital Cost: $5.78B – $8.10B (excluding balance-of-plant, land, water infrastructure, or electrical grid integration) [1, 2]

If you need a breakdown including balance-of-plant costs, water treatment, or power electronicsfor a specific project site, let me know.


r/Hydrogen2030 • • 3d ago

Cheap Power makes CheP Green Hydrogen

4 Upvotes

I’d question Google myself cause No Australia "……….ALWAYS Question Chile is widely recognized as the cheapest country to produce green hydrogen, with levelized production costs projected to drop to roughly $1.10 to $1.50 per kilogram by 2030. This advantage is driven by intense solar irradiance in the Atacama Desert and powerful, consistent wind resources in Patagonia. [1, 2]

Top Low-Cost Green Hydrogen Producers

Other leading nations benefit from abundant renewable energy and low capital or operating expenses:

  • Namibia: Rivals Chile due to exceptional solar and wind resources in its southern region, with production estimates near $1.50/kg. [1]
  • China: Features rock-bottom capital and operational costs for electrolyzers, making northern China one of the most cost-competitive regions globally (close to $1.50/kg). [1]
  • Brazil: Combines high renewable integration from wind and solar to target some of the lowest costs in South America (around $1.47/kg by 2030). [1]
  • India: Leverages low-cost solar and wind expansion to drive production down toward the $2.00/kgthreshold. [1, 2]

r/Hydrogen2030 • • 3d ago

Denmark 300 megawatts

14 Upvotes

$&$$$$$$ getting the FID all that matters , I’m guessing next PR $PLUG 🚨 BIG NEWS FROM DENMARK! 🚨🇩🇰🇪🇺

Remember Plug Power’s 1 GW electrolyzer order with H2 Energy Europe in May 2022?

🔥 H2 Energy Europe is now MorGen Energy, developer of the Njordkraft Hydrogen project in Esbjerg!

💰 Its initial 300 MW phase has been selected for approximately €423 MILLION in potential EU hydrogen support over 10 years!

WHY THIS MATTERS:

✅ Plug already announced a 1 GW order with this developer in 2022.

✅ EU funding support strengthens project economics and could help unlock FID.

✅ A renewed supply agreement or NTP could bring this opportunity closer to actual deliveries and revenue!

⚠️ The original order’s current status has not been reconfirmed.

Could this massive 1 GW opportunity finally move forward? 🔥

Huge amounts of opportunities are converting into real money starting from 2027 🚀


r/Hydrogen2030 • • 3d ago

PEM Electrolyzers 62% Europe

7 Upvotes

PEM is winning Europe, 62% is dominant choice

Europe needs more electrolyzers – and better technology for PEM systems

The European hydrogen economy continues to grow, despite a slower market expansion than what was predicted a few years ago. At the same time, market data indicates that PEM electrolysis is solidifying its position as one of the leading technologies for fossil-free hydrogen production. These conclusions are highlighted in the *Clean Hydrogen Monitor 2026* report, published by Hydrogen Europe.

Fredrik Liljeberg • October 21, 2026

According to the report, the electrolyzer market is still growing, but the expansion is occurring more slowly than earlier ambitions suggested. For Europe to reach its climate goals and meet the regulatory-driven demand for green hydrogen, investment decisions corresponding to approximately 25–30 GW of new electrolyzer capacity are required within the next few years.

PEM takes a leading role in Europe

The report also states that PEM electrolysis now accounts for approximately 62 percent of Europe’s operational electrolysis capacity. This demonstrates that the technology holds a strong position in the European market and plays a central role in many of the facilities currently in operation.

For the industry, this means the focus is shifting increasingly from the choice of technology toward performance improvements. As the market grows, there is an expanding need for solutions that can enhance energy efficiency, reduce material consumption, and lower the cost of hydrogen production.

“The report confirms the long-term market potential for PEM electrolysis in Europe. At the same time, we see that the next phase of growth will be driven by technical improvements that make electrolyzers both more resource-efficient and more cost-effective. This reinforces the relevance of the PTE technology we are developing to reduce the use of critical materials in PEM systems.” 
Fabian Wenger, Head of Technology, Smoltek Hydrogen

The


r/Hydrogen2030 • • 3d ago

Can $PLUG achieve 20% Margins 4Q 2027 ??

8 Upvotes

If the answer is YES, we 10x


r/Hydrogen2030 • • 3d ago

Ask me Anything Hydrogen

Thumbnail
1 Upvotes

r/Hydrogen2030 • • 3d ago

A full Equity research report copied into the comments below. A bit long but goes deep into Plug's business

Thumbnail
3 Upvotes

r/Hydrogen2030 • • 4d ago

$PLUG Bullish Case 10x

19 Upvotes

Can $PLUG pull a Bloom with Billions and go 10x ??? The idea of a 10x return on Plug Power (PLUG) is a popular thesis among clean energy bulls, but it sits alongside major financial hurdles. [1, 2]

The 10x Bull Case 🚀

To achieve a 10x return from its current price of $1.42, PLUG would need to climb to roughly $14.20 per share, pushing its market cap from ~$1.98 billion to nearly $20 billion. Long-term growth catalysts driving this thesis include:

  • The Revenue Vision: Management targets up to $20 billion in revenue by 2030. Analysts are more conservative, forecasting an 18.5% compounded annual growth rate (CAGR) to reach about $1.2 billion in revenue and $137.5 million in earnings by 2029. [1, 2]
  • Operational Turning Points: In late 2026, Plug Power signaled a significant drop in its preliminary Q3 cash burn down to $28 million (compared to $61 million in Q2), demonstrating much stronger cash discipline. [1, 2]

r/Hydrogen2030 • • 4d ago

$PLUG Will Copy $GEVO Fast Forward #TaxCredits

8 Upvotes

The beauty of the Big Beautiful Bill, you can TRADE and Weaponize your Balances Three-Year Delivery of Durable Carbon Removals from Gevo North Dakota to a Leading Global Enterprise Software Company

Gevo will supply durable carbon dioxide removal (CDR) credits from Gevo North Dakota, one of the world’s first commercial Bioenergy with Carbon Capture and Storage (BECCS) ethanol plants, under a long-term agreement

CEEZER will procure and manage the removal portfolio on behalf of a global Fortune 500 enterprise software company

ENGLEWOOD, Colo., Oct. 14, 2026 (GLOBE NEWSWIRE) -- Gevo, Inc. (NASDAQ: GEVO) today announced a three-year agreement with CEEZER, a leading carbon management platform for enterprise customers, for the sale of CDR credits generated at Gevo's North Dakota carbon capture and sequestration project. This first multi-year agreement for Gevo supports its path toward a carbon business exceeding $30 million in annual revenue from existing operations.

The agreement of a five-figure volume of tons of contracted CDRs through 2029 expands Gevo's growing portfolio of contracted carbon removal credit sales. Gevo believes this transaction further validates both the market demand for high-quality, durable carbon removals generated through BECCS as well as a broader move among corporate buyers from one-off purchases towards multi-year offtakes that secure supply, price and quality for high-durability removals.

“We expect increased sales to buyers seeking permanent carbon removal solutions backed by the rigorous measurement, reporting and verification standards Gevo provides,” said Gevo Chief Carbon Officer Alex Clayton. “Gevo is a high-integrity, high-quality producer who can supply today to meet market needs. It’s encouraging to see customers now moving to multi-year agreements and we anticipate more as companies continue to secure long-term access to durable carbon removal solutions.”

The contracted CDRs will be generated by Gevo North Dakota, which captures biogenic carbon dioxide from ethanol production and permanently stores it through geological sequestration. The resulting CDRs are designed to provide verifiable, durable carbon removal that can be used by organizations pursuing net-zero and climate commitments.


r/Hydrogen2030 • • 4d ago

Earnings Nov 9th

4 Upvotes

We already had a pre release

I’m expecting 196 million and minus 1% margins


r/Hydrogen2030 • • 4d ago

Whose Betting with Shorts ??

1 Upvotes

Have we hit that $1.35 BOTTOM?

would You Bet Ballard Vs Plug ??

can $PLUG owners think NEXT BLOOM ???


r/Hydrogen2030 • • 5d ago

GravitHY 720 megawatts

4 Upvotes

Plenty of potential out there and potential means nothing til FID 🚀 GravitHy selected by the EU Innovation Fund to accelerate the deployment of low-carbon iron production in Europe
 
📣We are proud to announce that GravitHy has been selected under the Large-Scale category of the 2025 EU Innovation Fund and has been awarded a key subsidy to support the development of its flagship low-carbon iron project in Fos-sur-Mer, France.
 
🦾This recognition marks a major milestone as we advance towards our targeted Final Investment Decision and confirms the strategic importance of hydrogen-based iron production for Europe's industrial future.
 
🏭With a planned production capacity of 2 million tonnes of low-carbon iron per year, corresponding to over 3 million tonnes of avoided CO2 emissions, GravitHy aims to help decarbonise steelmaking while strengthening Europe's industrial resilience, security of supply and competitiveness. 
 
💚The award by the EU Innovation Fund is a strong vote of confidence in our project, our partners and our ambition to build one of Europe's first large-scale hydrogen-based iron production facilities.


r/Hydrogen2030 • • 5d ago

Toyota 3000 H2 Trucks

5 Upvotes

New Zealand and Australia looks like H2 scaling

  • Thailand’s Board of Investment has approved Toyota Motor Thailand’s THB1.49 billion [$41.7 million USD] project to produce hydrogen fuel cell Hilux pick-up trucks at its Ban Pho plant in Chachoengsao, with an annual capacity of 3,000 vehicles and production due to start in December 2027.
  • Initial output will go entirely to export markets — Europe, Australia and New Zealand — with Toyota having confirmed in 2025 that the hydrogen Hilux would be available from 2028 in Europe and Oceania.